• Road Refurbishment Ntoum – Cocobeach II

    Client: Ministry of Building, Equipment and Road Construction, Gabon
    Project location: North-west Gabon
    Project term: 32 months
    Project start: 2010

Contract:

Refurbishment of the road between Ntoum and Cocobeach in the north west of Gabon - 2nd section

Background

Cocobeach has been linked to the national road network for the first time in 1983. Since then, the region has flourished economically and socially. Due to the economic crisis of the last decade, however, the country was unable to develop or maintain the existing infrastructure. Especially the poorly maintained road between Ntoum and Cocobeach increasingly proved to be a stumbling block for further development. That was the reason why the refurbishment in sections of this road was not just part of a nationwide programme of development for the road network, but it was considered to be one of the projects with the highest priority.

Project

The road between Ntoum and Cocobeach in the country's far north is approximately 81 kilometers long. In the second construction phase, the section of 56 kilometers length, from kilometer 24,5 until Ntoum, will be refurbished. In addition to the construction of a new bridge with a length of 47 meters, the rehabilitation of 7 existing bridges has also been planed.

Services

Overall planning
Sourcing and ensuring financing
Call for tenders for the delivery of the required equipment

More pictures of the project

Comprehensive competences

Benefit from our expertise

With well-founded knowledge in the fields of water, wastewater, energy, transport and financing, GAUFF Engineering convinces worldwide. It is based on decades of practical experience. This creates as a result efficient, sustainable and environmentally friendly solutions that give regions an essential added value.

Learn more

Career at GAUFF Engineering

Job offers 

d.vinci

All vacancies