• Libreville water supply

    Client: Ministry of Mining, Energy, Oil and Water Resources
    Project location: Libreville
    Project term: 18 months
    Project start: 2010

Contract:

Libreville water supply

Background

In terms of access to drinking water, the Gabonese Republic is the leading African country south of the Sahara. Even the distribution of drinking water through household connections has reached an exemplary level. The Republic of Gabon is determined to maintain this lead and to expand it further. With this in mind, GAUFF Engineering is performing a technical examination of Libreville's drinking water supply grid.

Project

The project is designed to reduce water loss significantly. In addition, the overall supply of drinking water is to be improved. Immediate measures are designed to bring about noticeable improvements within six months. The construction work to be performed throughout the entire project is closely linked to the immediate measures.

Services

Study on the water supply system
Development of scenarios for the future supply situation
Definition of options to improve the system
Description of the resultant construction measures

More pictures of the project

Comprehensive competences

Benefit from our expertise

With well-founded knowledge in the fields of water, wastewater, energy, transport and financing, GAUFF Engineering convinces worldwide. It is based on decades of practical experience. This creates as a result efficient, sustainable and environmentally friendly solutions that give regions an essential added value.

Learn more

Career at GAUFF Engineering

Job offers 

d.vinci

All vacancies