• Rehabilitation of the water distribution centers in Beira

    Client: FIPAG
    Project location: Beira, Mozambique
    Project term: 24 + 12 months  
    Project start: 05/2021

Contract:

Planning and construction supervision of the rehabilitation of the water distribution centres in Beira, Mozambique

Background

Under multilateral agreements with the World Bank, the Government of Mozambique (GoM) is implementing reforms in the field of urban water supply aimed at improving the supply, quality and the efficiency. Among other things, the program includes investments in the rehabilitation and expansion of the urban water supply in Beira, Mozambique's second largest city. The Fundo de Investimento e Património do Abastecimento de Água - FIPAG (Investment Fund and Asset Manager of Water Supply) is responsible for the implementation.

The main task of FIPAG is to ensure an adequate and safe water supply for the population in accordance with the Mozambican health and hygiene standards.

Project

GAUFF Engineering was commissioned with the technical planning and construction supervision for the rehabilitation of the existing distribution centres in the city of Beira, as well as for the construction of a new distribution centre in the Estoril district. As a basis for the planning, the specialists from GAUFF-Engineering carried out on-site inventories in the existing distribution centres in order to determine the entire need for renovation after assessment and technical evaluation.

The planning work includes the special field of civil engineering structures, technical equipment piping and machine technology, technical equipment electrical engineering and telecontrol technology as well as structural engineering.

The actual construction work will be tendered and awarded within the framework of an international tender using the Standard Procurement Documents of the World Bank. The construction period is about 12 months plus a 12-month warranty period.

Services

Inventory and technical evaluation of existing structures
Planning of rehabilitation and new construction measures
Preparation of the specifications and tender documents in accordance with the Standard Procurement Documents of the World Bank
Preparation of the award proposal/participation in the award
Safety and health protection coordination
Environmental impact assessment
Assessment of socio-economic impacts
Construction supervision of the planned rehabilitation and construction work
Technical support during the warranty period

More pictures of the project

Comprehensive competences

Benefit from our expertise

With well-founded knowledge in the fields of water, wastewater, energy, transport and financing, GAUFF Engineering convinces worldwide. It is based on decades of practical experience. This creates as a result efficient, sustainable and environmentally friendly solutions that give regions an essential added value.

Learn more

Career at GAUFF Engineering

Job offers 

d.vinci

All vacancies