• Technical Assistance on the OMVG Energy Project

    Client: Organisation pour la Mise en Valeur du Fleuve Gambie (OMVG)
    Project location: Senegal, Gambia, Guinea, Guinea Bissau
    Project term: 103 months
    Project start: November 2015

Contract:

Represent "Organisation pour la Mise en Valeur du Fleuve Gambie" (OMVG) as a contractor to build the new "Sambangalou" hydroelectric power plant, the high-voltage transmission networks, and the corresponding infrastructure

Background

"Organisation pour la Mise en Valeur du Fleuve Gambie" (OMVG) is a cross-border organisation of the West African countries Senegal, Gambia, Guinea and Guinea Bissau that has been campaigning for the shared use of the natural resources provided by the Gambia river since the 1980s. Among other projects, it strives to generate power in a resource-efficient way with hydroelectric power plants, the continuity of which have been guaranteed in the context of a long-term energy development programme.

Project

GAUFF Engineering was commissioned by OMVG as a contractor to represent the Owner during the construction of the "Sambangalou" hydroelectric power plant, its high-voltage transmission network, and the corresponding infrastructure. This also involves connecting the Kaleta power plant in Guinea to the OMVG power distribution grid. 
The Sambangalou power plant will be built 22km south of Kedougou, a city in Senegal, and will have an installed capacity of 128 MW. 1,677 km of 225 kV high-voltage power lines, 15 transformer stations and one central distribution hub to form a power network spanning all four OMVG countries are the main components of the infrastructure that will be used to distribute the generated power. GAUFF will also provide technical assistance when the Kaleta power plant, which has already been built in Guinea, is commissioned. This power plant is located about 120 kilometres north-east of the country's capital, Conakry, and has an installed capacity of 240 MW. 
Sambangalou is expected to generate 394 GWh per year and Kaleta 946 GWh. This would cover 12.6% of the overall need predicted for the OMVG countries for 2018.
The project will be financed with 810 million euros from the African Development Bank and the World Bank, who will be co-financing it together with six other international financial institutions.

Services

Representation as a contractor
Contract management
Development and management of the project management unit for

  1. administrative tasks 
  2. financial management
  3. environmental management
  4. socially acceptable resettlement
  5. construction supervision
Assistance in the call for tenders, tender evaluation, and contract negotiation
Training and transfer of knowledge for OMVG and PMU employees
Assistance in selecting the future operator
 

Additional Info:

More pictures of the project

Comprehensive competences

Benefit from our expertise

With well-founded knowledge in the fields of water, wastewater, energy, transport and financing, GAUFF Engineering convinces worldwide. It is based on decades of practical experience. This creates as a result efficient, sustainable and environmentally friendly solutions that give regions an essential added value.

Learn more

Career at GAUFF Engineering

Job offers 

d.vinci

All vacancies